New build Weener XL in ‘s-Hertogenbosch

11 December 2023

vb&t Projectmanagement has been allowed to act as delegated contractor on behalf of Weener XL and the municipality of ‘s-Hertogenbosch for the construction of 14,000 m2 of new office and development space for the municipality of ’s-Hertogenbosch’s Weener XL company.


Stakeholders

Client: Municipality of ‘s-Hertogenbosch /Weener XL

Project management:  Municipality of ‘s-Hertogenbosch

Architect: TarraKade (Tarra Architecture & Urban Planning en Buro Kade)

Integrated design management: Hevo

Manufacturer: Archimedes Construction Advice

Contractor: Dura Vermeer

Installer: Van Delft Group

Landscape Architecture: MTD Landscape Architects

Outdoor space layout: RA+ Engineers

Acoustics consultant: Tritium Advice

Installation advice & energy advice: Boink Project & Energy Management

New build Weener XL in ‘s-Hertogenbosch

 

A new home for Weener XL was badly needed. With this new building, the more than 17,000 residents who are received annually can be served and supported in a pleasant environment. With the completion of this new headquarters, Weener XL aims to strengthen its position as a leading force in promoting social work.

The organization has focused on creating opportunities for vulnerable individuals, including people with disabilities, long-term unemployed, and others facing obstacles on the labor market. Through customized training programs, career guidance, and placement services, Weener XL has already successfully supported countless people.

The employees also needed a new working environment. The building offers everything necessary for an optimal working climate and is flexible for the future. But also think of sufficient peace and quiet, space, privacy and safety, so that Weener XL can best support all the people who use the services.


Sustainability is central

The new Weener XL facility on the old Michelinterrein will be one of the most sustainable buildings in ’s-Hertogenbosch. The building will be energy-neutral and gas-free. ‘No waste, no waste’ is the starting point.

As much as possible, buildings are constructed using recycled materials and resources. Solar panels and heat pumps provide the energy required. In addition, a large part of the roof is planted with sedum. The building – with an area of approximately 14,000 m2 – is built in separate elements. This makes it modular and easy to reuse.

In that respect, it has also been chosen to use reusable bio-based materials. These are materials that can be absorbed by nature again or can be easily reused.

New build Weener XL in ‘s-Hertogenbosch

The use of biobased materials has been implemented in many parts of the Weener XL building. This has also resulted in the storage of at least 1,150 tons of CO2 in the building, thanks to the choice of the construction system of wooden columns, wooden joists, wooden sheathing elements that are covered with flax, and wooden channel-plate floors.

Thanks to the wooden structure in the form of a modular skeleton with a base size of 7.5 x 7.5 m, a building that can be used flexibly has been created. All departments and components of the Weener XL service are housed within these basic building blocks. Simple, modular and clear.

New build Weener XL in ‘s-Hertogenbosch

This makes Weener XL an inspiring and healthy workplace with flexible and fixed workstations, outdoor spaces, reception areas, meeting spaces, meeting rooms and production areas. Due to the many combinations that are possible, the building has endless faces.

The soft appearance of the materials used and the human scale of the construction elements create a personal and pleasant atmosphere. People did not just encounter each other in the old building; this building is focused on connection.

Furthermore, for all applications involving production or logistics, the space can be used multiple ways because it is designed and configured according to need.

Sjoerd van het Erve – director of Weener XL; ‘When you walk in here, you know what you’re doing. Namely to involve as many Bosschenaren as possible in our society. We believe in work. Work not only provides income, but structure, pride, self-worth and better health. There are many people who work very hard for this every day. There are also people for whom working doesn’t come naturally. You also have a responsibility to bear for that.’ That is what Weener XL, the work and development company of the municipality of ‘s-Hertogenbosch, with 1,850 employees, does.

The target groups are people with a distance to the labor market, those who apply for assistance, those who are helped with work or income, and newcomers who need to become Dutch citizens.

Nomination for the National Wood Construction Prize 2023

The new building of Weener XL has been nominated for the National Wood Construction Award 2023 by the Houtblad magazine in the category “Commercial wood construction”.

______________________________________________________________________________________________________

More news? View more current developments from vb&t Groep