vb&t personal

The Pershal in Amsterdam is open!

On behalf of Kroonenberg Groep, the former Telegraaf building has been highly renovated into an office building according to the design of Rijnboutt. vb&t Projectmanagement has carried out the total cost and project management for this project from the initial planning phase through to the post-project follow-up phase.

The Pershal is the redevelopment of the printing press in the former Telegraaf building. The national monument located in the heart of Amsterdam was completely renovated by Salverda, Spiering and Kuijpers within 1.5 years. A steel structure with bridges and stairs was added and the architect chose to maintain the business-like, atmospheric and industrial character. The finish is of the highest standard, using oak headboards, natural stone walls, a visible steel and concrete structure and lots of glass. It is an extremely unique building that has been beautifully transformed.

vb&t Projectmanagement was involved in the direct management from the design phase right up to the completion of the project. vb&t Projectmanagement was responsible for the management of the design team (consisting of the architect, constructor and installation consultant) in order to deliver a design in time that met the client’s wishes and that could also be implemented by the contractors. Subsequently, vb&t Projectmanagement led the procurement process, with obtaining complete and market-compliant prices being the ultimate goal. After contract signing, the implementation phase began, during which the design came to life. Again, vb&t Projectmanagement provided guidance to the construction team (consisting of a structural engineer, electrical installer, mechanical engineer and the architect) and was closely involved in the implementation.

Our colleagues from vb&t Fire Safety The project team has supported the design and implementation teams in various stages of the project, including the development of the Fire Safety Master Plan, the UPD Sprinkler System and the PvE Fire Alarm and Evacuation Alarm System, as well as implementation guidance and certification support.

The teams of Project Management & Brand Security are proud to be able to manage this development and are more than happy with the final result after an intensive period!

Task: Kroonenberg Groep
Design: Rijnboutt
Project management: vb&t Projectmanagement bv

Fire safety consultant: vb&t Fire Safety
Contractor: Salverda Construction
Installation advice: Nelissen Engineering Office
Electrical installations: Spiering Installation Technology
Mechanical engineering installations: Kuijpers
Manufacturer: IMd Consulting Engineers
Natural stone: Dr. R. (Roderick) Nijenhuis
Lighting: Intra lighting Benelux B.V.
Photography: Ossip van Duivenbode